BIM – NOI Techpark
D2 & D3,
Bolzano
                  BIM: Innovation, Integration, Inspiration
                Client
                Unionbau Ltd
              
                          
                Year of service
                2024
              
                          
                Cost of the work
                12,5 M€
              
                      The BIM project for NOI Techpark in Bolzano focuses on buildings D2 and D3, encompassing various key stages of design and construction.
- PGI Development: The development of the General Intervention Plan guided the project, providing a structured and integrated framework.
 - Architectural Modeling: We created detailed models of the buildings, ensuring a functional and aesthetically pleasing design.
 - Structural Modeling: The structural modeling ensured safety and stability, using BIM technologies to optimize engineering choices.
 - As-Built Architectural and Structural: After construction, the as-built models accurately reflect the final conditions of the buildings, facilitating future maintenance and modifications.
 
With a project cost of 12.5 million euros, this initiative demonstrates the importance of an integrated approach to BIM, coordinating architecture and structural engineering to deliver high-quality results.